Checklist Template Information
Maintainer: Blu Banyan
Version: 1
Tags: Residential
Description:
Section 1: Ground

Help
Indicate if the homeowner communicated with you that they do not wish to proceed with the project
Help
Define the home type (e.g. single-story, two-story, etc.). This helps determine accessibility and the installation approach.
Help
Confirm the location of the main service panel or subpanel. If inside the home additional coordination with the homeowner may be needed for access during installation.
Help
Identify the brand of the main electrical service panel (e.g. Square D, Siemens, GE, Eaton). This is important for selecting compatible breakers and equipment.
Help
Record the amperage rating of the main breaker (e.g. 100A, 200A, 400A). This determines the available capacity for the solar system interconnection.
Help
Document the bus bar rating of the main service panel (typically 100A, 125A, 200A, 225A, or 400A).
Help
Verify if the grounding electrode conductor bond to the cold water pipe is visible and accessible. This is required by NEC for proper system grounding.
Help
Record the capacity any battery storage system proposed (e.g. Tesla Powerwall 13.5 kWh or Enphase IQ 10). Input 'N/A' if no battery is included.
Help
Indicate if aerial imaging via Scanifly or similar technology is needed for roof measurements and shading analysis.
Help
Confirm that all required site survey photos have been uploaded to the project management system (roof, electrical panel, proposed equipment locations etc.).
Help
Enter the date the site survey was conducted.
Section 2: Roof

Help
Contact your supervisor if there is no layout provided
Help
Indicate if any solar panels are planned for installation on structures other than the main roof (e.g. garage, carport, pergola, ground mount).
Help
Record the type of roofing material present (e.g. composition shingle tile, metal, TPO, etc). This determines the appropriate mounting hardware and installation method.
Help
Measure and record the pitch of the steepest roof section where panels will be installed. This affects safety requirements and installation difficulty.
Help
Determine if conduit or wiring needs to be run through the attic space. If unknown note for further investigation during installation.